Ocean Business

CRE Marine have just opened their new facility at the Bourtree Complex in Altens, Aberdeen:

The newly refurbished 940m² facility was designed specifically for the manufacture of underwater cable assemblies and connectors. It incorporates a completely integrated receipt of goods, stores, cable preparation, termination, moulding, QC and dispatch facilities.

The new facility was designed to be simple and logical in order to reduce risks such as manual handling where ever possible. Equipment lifts were installed for easy transfer of components between the preparation and assembly areas. Large easy access doors are fitted in each section for direct delivery of large objects such as cable drums.

The new facility has increased production capacity by 100%. Continued investment in people and equipment will enable us to both satisfy our existing customer base and strategically grow our international business.